Lead Times

How Long Custom Machined Parts Take

A quote in two days. Parts in four to six weeks. Here is where the time goes.

At MI CNC Parts, custom CNC machined parts take Rush 1-2 weeks, Standard 4-6 weeks, or Extended 6-8 weeks from approved quote to delivery, from one piece to production runs of 10,000, and Standard is the typical window. Rush parts are machined parts with no secondary operations. The quote comes back in 24-48 hours. Material availability, finishing, tolerances, quantity and open questions on the print set the date. Send a STEP file and a PDF through the quote form with your need date and the quote states a ship date.

Updated November 2026

Start Here

Get a Quote in 24-48 Hours

Send us your files and we’ll quote it, usually within 24-48 hours.

Need an NDA before you send files? Ask for one and it’s sent the same day.

Get My Quote

Commercial work only. We don’t quote aerospace, firearms, DoD, ITAR, or EAR-controlled parts.

Before you send it

No C of C or material certifications ship with parts by default. If your PO needs them, say so before the quote. Inspection reports on critical dimensions aren’t included by default. If you need one, ask when you place the order.

What ships with an order covers inspection, inspection reports and certificates in one place.

If a part doesn’t match the print, it’s remade or credited.

Rush 1-2 weeks applies to machined parts with no secondary operations. Heat treat, grinding, EDM and finishing add time, and the quote gives the real date. Lead time starts at order approval. Put your need date in the part description and the quote answers it.

How long does CNC machining take?

Quote: 24-48 hours after you send files. A person reads the model and the print, checks material and quantity, and replies with price, material, and lead time. Approval: whenever you say go; nothing is scheduled until then.

From approval to parts on your dock: Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren't time-sensitive. Inspection happens inside those windows, never after them, on a rush job as much as a standard one. Every part inspected against your print before it ships. Laser-cut parts are quoted per job, rush available.

From files to parts on your dock
StageTimeWhat to know
Quote24-48 hoursA person reads the model and the print
ApprovalWhen you say goThe lead-time clock starts here
Rush1-2 weeksMachined parts with no secondary operations, quoted at a premium
Standard4-6 weeks (typical)Preselected on the quote form
Extended6-8 weeksFor jobs that aren’t time-sensitive

Where do the weeks go?

The first stretch is getting the right stock in the right size, and nothing can be cut until the material arrives. Then comes setup, which is done once per job rather than once per part, so a quantity of one carries all of it. After machining, anything on the print beyond the metal adds its own stage: anodize, powder coat, or passivation each run as a separate step with their own turnaround, and a part that needs two finishes waits for both. Last is inspection and packing.

Which of the three delivery tiers to pick

The quote form asks which of three you want, and Standard is preselected. Rush is 1-2 weeks, for a date that already exists: a down machine, a booked validation slot, a show. Rush is quoted at a premium.

Standard is 4-6 weeks, the typical window. Extended is 6-8 weeks, for a job with no date behind it: a spare that goes on a shelf, a second set of fixtures for a line that runs next quarter, a design you are still iterating around.

Pick the tier that describes your actual deadline rather than the one that sounds safest. A date that is soft but marked Rush pays the premium for nothing. A date that is real but marked Extended means the parts are scheduled to arrive after it. Extended carries no price claim in either direction here: it is a timing choice, and the quote prices the job on the print, the quantity and the work, exactly as what determines the price sets out.

The tier is a starting point, not a contract you are stuck with. If the timing changes after you send files, say so in a reply and the quote follows the new date. And if a tier cannot be met for your part, you hear that in the quote rather than at week five: rush parts covers what makes a part rushable and what does not.

What stretches a lead time, and how to shorten it

Material that has to be special-ordered adds time before anything is cut, and finishing adds a stage of its own, especially any finish that runs in batches. A finish called out on the print is quoted with the part. Smaller tolerances take more time to produce and give inspection more to check, and a part in stainless steel or titanium takes longer than the same part in aluminum. A print with tight callouts on every dimension carries more of that work than the same part with tight callouts only where surfaces mate, which is why tolerancing only what matters pays off.

The stretch nobody plans for is the unanswered question. A missing material callout, two revisions in one ZIP with no note on which is current, or a thread spec that is not on the drawing all stop a job until someone replies. A quote here comes back with those questions in it, so the fastest thing you can do for your lead time is answer them the same day.

Say the date up front. A date in the quote request is part of the quote from the start, which is different from asking for speed after approval. Pick stock materials in stock sizes when the design allows, and stay flexible on grade where function permits: say so in the part description and the quote can name a more available grade, such as 6061 in place of a specific 7075 temper. If the finish is cosmetic, ask for the parts as-machined. And send one clean revision, a STEP model plus a PDF print, so nothing waits on a clarification.

If only some of the parts are urgent, split the order: the two critical pieces on Rush, the rest on Standard. Only the pieces on the critical path carry the Rush tier, and the line gets running as fast. Rush CNC parts covers what a rush buys and what genuinely cannot be hurried.

Ordering: what to send and quantities

  • What to send. Any file type is accepted. A STEP model plus a 2D PDF drawing is ideal; IGES, SLDPRT, Parasolid, DXF, DWG, STL and ZIP all work, and a sketch, photo or new sample part can start a quote. Every quote includes a free design review of your own design: the team reads the model and the print for what will cost more or may not work, and the notes come back with the price.
  • Quantities. Prototype first, then the run: prototype CNC machining covers the first piece and small-batch CNC machining the run that follows.
  • Files, payment and lead time. How to order CNC parts and what ships with an order cover files, payment, vendor setup, blanket orders and lead time.

Compared with instant-quote platforms

Instant-quote platforms publish their fastest lead times on their own pages, and where the date is the deciding factor those are the numbers to check against your part; the three-way comparison of published terms sets them out with dates. Here the quote takes a day or two because a person reads the drawing, and the lead time that comes back covers the whole job, finish and inspection included, so the date is one you can plan around.

Questions

Before you send a job.

01 What are average lead times for custom CNC parts?

Here the typical window is Standard, 4-6 weeks from order approval. Rush is 1-2 weeks for machined parts with no secondary operations, and Extended is 6-8 weeks for a job with no date behind it. Another supplier’s average is theirs to state, so ask each one what its date includes.

02 How long do custom machined parts take?

Rush is 1-2 weeks, Standard is 4-6 weeks (typical), and Extended is 6-8 weeks, for jobs that aren't time-sensitive. The clock starts at order approval. The quote itself comes back in 24-48 hours and states the lead time for your specific part.

03 What is the extended 6-8 week option for?

A job with no date behind it. It is the third choice on the quote form, next to Rush at 1-2 weeks and Standard at 4-6. It carries no price claim in either direction, so pick it because the timing is genuinely flexible, not because you expect a different number.

04 What is the rush lead time, and can I get parts in a week?

Sometimes. Rush is 1-2 weeks, and whether a week works depends on the material and on what else is on the print. Put the date in the part description and you get a real answer within 24-48 hours, including a plain no if it cannot happen.

05 How do I compare lead times between suppliers?

Compare what each date includes: whether the clock starts at the quote or at approval, whether finishing and inspection sit inside it, and whether it is a published fastest case or a date for your part. Send the same print and the same need date to each and read the answers side by side. Here the date in the quote is for the whole job as the print describes it.