Quote
Send your STEP files and drawings. You get a real quote (material, price, and lead time) usually within 24-48 hours.
Industry · 14 / 15
Fabrication and welding shops order the part of a job they do not make themselves: machined and turned components that go into a weldment, laser-cut blanks past the size or thickness their own table handles, and the weld fixture the job needs. It is quoted from your print in 24-48 hours through the quote form, on one purchase order, with no minimum. Vendor setup takes a day: W-9, NDA, net terms available.
Updated October 2026
Example part, modeled for illustration.
Start Here
Send us your files and we’ll quote it, usually within 24-48 hours.
Need an NDA before you send files? Ask for one and it’s sent the same day.
Commercial work only. We don’t quote firearms, DoD, ITAR, or EAR-controlled parts.
Or email your print to evan@micncparts.com.
Machined details for the weldments you build, quoted on one purchase order.
What We Make
A fabrication or welding shop rarely needs a whole job bought out. It needs the part of the job it does not make itself: the turned bushing that presses into a weldment, the machined pad that has to sit flat once it is welded in, a run of blanks in a thickness or size past what its own table handles, and the weld fixture the job needs before the first tack. All of it is quoted from your print on one purchase order, with no minimum order. Turned details are covered on CNC turning, flat blanks with their tapped holes, bends and hardware on laser-cut parts, and the tooling side on weld fixtures and jigs. Send the package and a person quotes it in 24-48 hours.
Typical parts
Most weldments carry a handful of features that no fabrication process puts there: a bored and reamed bushing seat, a turned boss that has to run true to a shaft, a pin that indexes two plates, a tapped pad on a surface that has to end up flat. Those are the parts quoted here. You keep the cutting, forming and welding; the machined details come back to your print, ready to drop into the fixture.
The welding side is documented separately. The American Welding Society publishes separate structural welding codes by base metal, among them D1.1 for steel, D1.2 for aluminum, D1.3 for sheet steel and D1.6 for stainless (source 1). Your weld procedure stays yours. The machined feature is dimensioned on your print and quoted from it.
There is no minimum. A set of six bushings for one weldment is quoted the same way as a hundred for a run of frames.
Aluminum is the clearest case. After welding, the properties of 6061-T6 near the weld are those of 6061-T4, a loss of strength of around 40% (source 2). The Aluminum Design Manual, as Wikipedia reports it, recommends taking the design strength of the material next to the weld as 165 MPa (24,000 psi) without proper heat treatment after welding, against a T6 ultimate tensile strength of at least 290 MPa (42 ksi) (source 2). A detail that carries a bearing load is one to weigh for machining from solid and pressing or bolting in rather than welding on as a pad. How the joint is designed stays with you.
Sheet aluminum behaves differently. Wikipedia describes 5052 as not heat treatable but hardened by cold working, lists 5052-H32 at 228 MPa (33,000 psi) ultimate and 193 MPa (28,000 psi) yield, and rates its arc weldability very good (source 3).
Steel is more forgiving. A36 plate, bar and shapes under 8 in thick have a minimum yield strength of 36 ksi (250 MPa) and an ultimate tensile strength of 58-80 ksi (400-550 MPa), and Wikipedia says A36 “is readily welded by all welding processes” (source 4). Because A36 welds readily, the reason to machine a steel detail tends to be geometry: a bore that has to be round and located, a face that has to be flat, a thread that has to be full depth.
Machining after welding is quoted when the whole job is one order: the parts are made, welded, then machined, as on laser cut and welded parts. A weldment you built and send in is not machined. For the weldments you build, what is quoted is the machined and turned details that go into them. On a one-order job, the weldment drawing marks the post-weld features, says which datums are established after welding rather than before, and gives the stock left on each machined surface.
Welding moves metal. Residual stresses left as a weld cools often lead to distortion or warping during machining, assembly and later use (source 5), and low-rigidity welded structures tend to distort after welding (source 6). That is the case for machining the features that have to hold after welding, so on a one-order job the print should say what moves and what has to hold: which faces get machined after welding and which are as-welded, the bore diameter and fit class on anything that takes a bearing or bushing, whether flatness is called out across the whole plate or per pad, and whether the assembly has been stress relieved.
AWS A2.4, Standard Symbols for Welding, Brazing, and Nondestructive Examination (source 7), establishes a method for specifying welding information by means of symbols. If the machined callouts are on the same sheet as the weld symbols, the quote is read from one drawing.
The second reason a fabrication shop buys out is size or thickness. When a job calls for a run of blanks past what your own table handles, or for a material you do not stock, the profile is cut and the secondary work goes on the same order: tapped and countersunk holes, bends, pressed-in hardware and a finish. Name the material and thickness on the print. The inside radius is quoted as drawn, with a note if it won’t form. A finish called out on the print is quoted with the part. That is laser-cut parts, and the way the operations stack onto one order is set out on laser cut, tapped and machined as one order. Laser work is quoted per job, rush available.
Two spokes are worth naming for a fabricator: plates and spacers for flat stock with holes in it, and laser-cut and bent brackets when the part is formed rather than flat. If the bracket is heavier or needs features a brake cannot hold, it moves to machined brackets instead.
The paperwork is the other half of buying out. Vendor setup takes a day: W-9, NDA, net terms available, with one contact from quote to delivery and no portal. A quote comes back in 24-48 hours whether the package is one turned bushing or a mixed order of machined details, laser-cut blanks and a weld fixture. Machined lines follow the three delivery tiers. Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren't time-sensitive. Rush is quoted at a premium. Rush 1-2 weeks applies to machined parts with no secondary operations. Heat treat, grinding, EDM and finishing add time, and the quote gives the real date. Lead time starts at order approval. Put your need date in the part description and the quote answers it. Every part inspected against your print before it ships.
No C of C or material certifications ship with parts by default. If your PO needs them, say so before the quote. Inspection reports on critical dimensions aren’t included by default. If you need one, ask when you place the order. Everything about how a job is bought here is on machined parts supplier, and if the drawing work is what you are short on, overflow engineering support is quoted per task.
All accessed 4 October 2026. Where a figure here differs from your print, the print governs.
1. Wikipedia, "List of welding codes": en.wikipedia.org/wiki/List_of_welding_codes (AWS D1.1 structural welding of steel, D1.2 aluminum, D1.3 sheet steel, D1.6 stainless steel).
2. Wikipedia, "6061 aluminium alloy": en.wikipedia.org/wiki/6061_aluminium_alloy (after welding, properties near the weld are those of 6061-T4, a loss of strength of around 40%; Aluminum Design Manual design strength next to the weld 165 MPa / 24,000 psi; T6 ultimate tensile strength at least 290 MPa / 42 ksi).
3. Wikipedia, "5052 aluminium alloy": en.wikipedia.org/wiki/5052_aluminium_alloy (not heat treatable, hardened through cold working; H32 ultimate 228 MPa (33,000 psi), yield 193 MPa (28,000 psi); arc weldability very good).
4. Wikipedia, "A36 steel": en.wikipedia.org/wiki/A36_steel (minimum yield 36 ksi (250 MPa) under 8 in thick; ultimate tensile strength 58-80 ksi (400-550 MPa); readily welded by all welding processes).
5. Wikipedia, "Vibratory stress relief": en.wikipedia.org/wiki/Vibratory_stress_relief (residual stresses often lead to distortion or warping of the structure during machining, assembly, transport, field use, or over time).
6. Horajski, Bohdal, Kukielka, Patyk, Kaldunski and Legutko, "Advanced Structural and Technological Method of Reducing Distortion in Thin-Walled Welded Structures," Materials (Basel), 2021, 14(3):504: pmc.ncbi.nlm.nih.gov/articles/PMC7864496/ (low rigidity structures tend to distort after welding).
7. American Welding Society, "A2.4:2020 Standard Symbols for Welding, Brazing, and Nondestructive Examination": pubs.aws.org/p/1999/a242020-standard-symbols-for-welding-brazing-and-nondestructive-examination (a standard that establishes a method for specifying welding, brazing and nondestructive examination information by means of symbols; referenced, not reproduced).
How It Works
Send your STEP files and drawings. You get a real quote (material, price, and lead time) usually within 24-48 hours.
Approve the quote and we’ll get your parts made, and keep you posted along the way.
The team reviews every part against your print before anything ships.
Your parts ship to you with tracking. If a part doesn’t match the print, it’s remade or credited.
Questions
A welded assembly built from laser-cut parts is covered on laser cut and welded parts. For a fabrication or welding shop the usual order is the other way round: you weld, and the machined and turned details, the blanks and the weld fixture are quoted here.
No. A weldment you built and send in is not machined. Machining after welding is quoted when the whole job is one order: the parts are made, welded, then machined, which laser cut and welded parts covers. For your own weldments, the machined and turned details that go into them are quoted from your print in 24-48 hours. A finish alone, with no machining on the order, is not quoted either.
Yes. A mixed package of turned bushings, machined plates, laser-cut blanks and a weld fixture is quoted as one order with one contact, and there is no minimum on any line of it. Multi-part jobs can ship together or in stages; say which on the quote. Machined lines follow the three delivery tiers. Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren't time-sensitive. Laser work is quoted per job with rush available.
The bore or thread size with its fit class, the datums the feature is located from, the material grade, and any finish. Other alloys and plastics quoted on request. Name the grade on the print. Position, perpendicularity and runout callouts are quoted from the print. AWS A2.4 weld symbols (source 7) on the same sheet keep the weld and machined callouts together. A fully dimensioned 2D PDF is quoted without a CAD line. A sketch, a new sample part or photos can start a quote, and the CAD work is quoted as its own line; photos with a ruler in frame help, and the quote lists what is still missing. The sample ships back with the parts.
Vendor setup takes a day. W-9, NDA and net terms are the usual package, and one person handles the account from quote to delivery. Card by secure link (a processing fee applies), ACH, wire or check. Shipping is quoted as its own line, or ships on your carrier account.
No minimum: one piece to production runs of 10,000. Ask for more than one quantity, such as 1, 25 and 100, and the quote shows each. Reorders at the same revision: send the last quote or PO number and it’s requoted. A year of usage on a repeating frame can be quoted as a blanket order delivered in releases. Price, release schedule and lead time per release are set in the quote.
More Industries
Brackets, plates, shafts and housings for robotics and automation, quoted from your print.
View → 02Instrument and fixture parts for medical and laboratory equipment, quoted from your print.
View → 03Shafts, plates, bushings and brackets for machine and equipment builders, quoted from your print.
View → 04Replacement and custom parts for industrial equipment, quoted from your print or a new sample part.
View → 05Prototypes and low-volume runs of the parts in your model, quoted from your files.
View → 06One-offs, iterations and bridge runs, quoted from your files with no minimum.
View → 07Milled enclosures, panels and heat sinks, quoted from your model and drawing.
View → 08Billet brackets, adapters and hubs, one-offs or small batches, quoted from your print.
View → 09Enclosures, mounts, bus bars and test-rig parts, quoted from your print.
View → 10Replacement parts and custom components for ag and off-highway equipment, quoted from your print.
View → 11EDC and knife parts and custom titanium pendants, quoted from your files.
View → 12Scientific parts and instrument components for test labs and R&D groups, quoted from your print.
View → 13Format parts, wear parts and replacements for packaging and food processing lines, quoted from your print.
View → 15Plates, bushings and turned pump parts, quoted from your print, one part or a production run.
View → ,Everyone we make parts for, in one place.
View All →Get Started
A quote in 24-48 hours, no minimums. Like the quote, and we’ll make your parts and ship them to you.
Get a Quote