Quote
Send your STEP files and drawings. You get a real quote (material, price, and lead time) usually within 24-48 hours.
Industry · 15 / 15
MI CNC Parts quotes machined pump parts to your print: shaft and seal sleeves, wear rings, adapter and regulator plates, throat bushings, spacers and collars, in 304 and 316 stainless, 17-4 PH, bearing bronze, PEEK and G10. Send a STEP and a PDF, or a new sample part, through the quote form and a person quotes it in 24-48 hours. There is no minimum, and every part is inspected against the print before it ships.
Updated October 2026
Example part, modeled for illustration.
Start Here
Send us your files and we’ll quote it, usually within 24-48 hours.
Need an NDA before you send files? Ask for one and it’s sent the same day.
Commercial work only. We don’t quote firearms, DoD, ITAR, or EAR-controlled parts.
Or email your print to evan@micncparts.com.
Plates, bushings and turned pump parts, quoted from your print, one part or a production run.
What We Make
Pump work usually arrives as one of two jobs. A replacement for a worn shaft sleeve, a wear ring that has opened up or a throat bushing, sent as a drawing, a model or a new sample part. Or a new part for a pump still in development: an adapter or regulator plate with O-ring grooves, a small first lot to check fit, then the production quantity on the same print. Both are quoted from what you send, made to the print and inspected before they ship, with no minimum on either.
Typical parts
The turned and milled parts that wear out, or that change between pump revisions: shaft sleeves and seal sleeves, case and impeller wear rings, throat and line bushings, spacers and collars, and the flat work around the pump, such as adapter plates, regulator plates, mounting plates and covers. Round parts are turned, plates are milled, and a sleeve or bushing whose print calls for a ground diameter or bore goes through precision grinding on the same order.
Parts are made to the dimensions, material and finish on your print. A plain bushing that carries a bearing load rather than protecting a shaft is covered on custom bushings.
A shaft sleeve is the replaceable skin on a pump shaft. Writing in Pumps & Systems, Jim Elsey gives its main job as protecting the shaft “from wear caused by packing abrasion, followed closely by prevention of erosion and corrosion,” and describes the sleeve as the part designed to be replaced (source 1). In some horizontal split-case pumps the sleeve also locates the impeller along the shaft (source 1). A sleeve is quoted as a single piece or as a family of similar sizes. Pump shaft sleeves has the full page on packing and seal sleeves.
The print for a sleeve carries the bore and its fit to the shaft, the OD and its finish under the packing or seal, the length and any shoulder that locates it, keyways or set-screw holes, an O-ring groove in the bore if there is one, runout between OD and bore, and the material. Position, perpendicularity and runout callouts are quoted from the print. With no drawing, a new sample part can be sent instead: it is measured, drawn and quoted through reverse engineering, with the CAD work quoted as its own line. The sample ships back with the parts. A family of similar sleeves, ten sizes in the same material for example, is quoted together with each size at its own quantity. A shop that rebuilds pumps and orders the same sleeves, rings and bushings year after year can start on wear parts for pump and motor repair shops, which covers reorders and blanket orders. Reorders at the same revision: send the last quote or PO number and it’s requoted. Price, release schedule and lead time per release are set in the quote.
Suction-side wear rings limit the flow from the higher-pressure discharge side of the impeller back to the suction side. Eugene Vogel of EASA writes in Pumps & Systems that excessive clearance at these rings can cause “a volumetric loss of efficiency,” and that the values in the API Standard 610 chart of minimum running clearances are very close to the general guidelines for new rings (source 2). The clearance on your drawing is what the ring is quoted to. MI CNC Parts does not set the fit or the running clearance.
Writing in Pumps & Systems, Robert Aronen says that with metal rings “an inherent risk of seizure exists,” and that nonmetallic materials “do not seize in the same manner as metal parts” (source 3). He quotes API 610 as asking for a Brinell hardness difference of at least 50 between mating rings unless both are at least 400, so the print for a metal pair should carry the hardness of each ring, or name a nonmetallic ring. Galling is a form of wear caused by adhesion between sliding surfaces (source 4). Put the hardness or condition of each ring on the print and it is quoted as drawn; if the hardness has to be checked, say so, and that can be arranged and quoted. Case and impeller rings have their own page, wear rings.
316 stainless is the usual step up from 304 where chlorides are present: its molybdenum gives greater resistance to localized attack by chlorides (source 5), and 304 is commonly replaced by 316 when it is too sensitive to pitting or crevice corrosion (source 6). 17-4 PH is a martensitic precipitation-hardened grade used where high strength, hardness and corrosion resistance are required (source 7), so it is the one to name when a sleeve or ring needs hardness. Bronze has low friction against dissimilar metals and resists salt water corrosion, and it is still widely used for bearings and bushings (source 8). PEEK is highly resistant to attack by both organic and aqueous environments and is used for bearings, pumps and compressor plate valves, with some grades useful to 250 °C (source 9); PEEK parts covers the grade. G10 is a glass-epoxy laminate favored for low moisture absorption and a high level of electrical insulation (source 10), so a print can name it for an insulating plate or spacer. Anodized 6061 covers plates and housings where the fluid allows aluminum. Other alloys and plastics quoted on request. Name the grade on the print.
| What it does | Materials prints name | What the print should carry | |
|---|---|---|---|
| Shaft or seal sleeve | Protects the shaft from packing wear, erosion and corrosion; the replaceable part | 316 or 304 stainless, 17-4 PH, bronze | Bore fit to the shaft, OD and its finish, length, runout, keyway or set screw |
| Wear ring | Limits flow from discharge back to suction | Bronze, stainless pairs with a hardness difference, nonmetallic ring materials | Diameter and running clearance, hardness or condition of each ring |
| Adapter or regulator plate | Mounts one pump component to another | PEEK, G10, anodized 6061, stainless | O-ring groove dimensions, flat faces, hole positions, finish |
| Throat or line bushing | A bushing the shaft passes through at the casing | Bronze, PEEK, stainless | Bore and OD fits, length, any groove or flange |
Yes. A handful of pieces can come first to check fit, then the production quantity follows on the same print. Ask for more than one quantity, such as 1, 25 and 100, and the quote shows each. Small-batch CNC machining covers how low quantities are quoted. Name the critical dimensions on the print.
Quotes come back in 24-48 hours. Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren't time-sensitive. A first lot on Rush and the production run on Standard can sit on the same quote. Rush is quoted at a premium. Rush 1-2 weeks applies to machined parts with no secondary operations. Heat treat, grinding, EDM and finishing add time, and the quote gives the real date. Lead time starts at order approval. Put your need date in the part description and the quote answers it.
Every part is inspected against the print before it ships. Vendor setup takes a day: W-9, NDA, net terms available, and one contact from quote to delivery.
No C of C or material certifications ship with parts by default. If your PO needs them, say so before the quote. Inspection reports on critical dimensions aren’t included by default. If you need one, ask when you place the order.
All accessed 4 October 2026. Where a figure here differs from your print, the print governs.
1. Jim Elsey, “Solid Shaft Designs & Cartridge Seals,” Pumps & Systems, 17 February 2016: pumpsandsystems.com/solid-shaft-designs-cartridge-seals (what a shaft sleeve is for; designed to be replaceable; locates the impeller in some horizontal split-case pumps).
2. Eugene Vogel, EASA, “Wear Ring Clearance for Centrifugal Pumps,” Pumps & Systems, 7 June 2019: pumpsandsystems.com/wear-ring-clearance-centrifugal-pumps (what suction-side wear rings do; excessive clearance and volumetric efficiency; API 610 chart values against general guidelines for new rings).
3. Robert Aronen, Boulden International, “The Power of Wear Rings Part Three: Safety,” Pumps & Systems, May 2011 issue, posted 17 December 2011, pumpsandsystems.com/power-wear-rings-part-three-safety (risk of seizure with metal rings; nonmetallic materials; API 610 hardness difference). Cited as plain text because the byline names the author’s company.
4. Wikipedia, “Galling”: en.wikipedia.org/wiki/Galling (galling as wear caused by adhesion between sliding surfaces).
5. Wikipedia, “SAE 316L stainless steel”: en.wikipedia.org/wiki/SAE_316L_stainless_steel (molybdenum gives greater resistance than 304 to localized attack by chlorides).
6. Wikipedia, “SAE 304 stainless steel”: en.wikipedia.org/wiki/SAE_304_stainless_steel (304 commonly replaced by 316 when too sensitive to pitting or crevice corrosion by chlorides).
7. Wikipedia, “17-4 stainless steel”: en.wikipedia.org/wiki/17-4_stainless_steel (martensitic precipitation-hardened grade; used where high strength, hardness and corrosion resistance are required).
8. Wikipedia, “Bronze”: en.wikipedia.org/wiki/Bronze (low friction against dissimilar metals; salt water corrosion; still widely used for bearings and bushings).
9. Wikipedia, “Polyether ether ketone”: en.wikipedia.org/wiki/Polyether_ether_ketone (resistance to organic and aqueous environments; bearings, pumps and compressor plate valves; operating temperature up to 250 °C for some grades).
10. Wikipedia, “G-10 (material)”: en.wikipedia.org/wiki/G-10_(material) (glass cloth in epoxy; low moisture absorption; electrical insulation).
How It Works
Send your STEP files and drawings. You get a real quote (material, price, and lead time) usually within 24-48 hours.
Approve the quote and we’ll get your parts made, and keep you posted along the way.
The team reviews every part against your print before anything ships.
Your parts ship to you with tracking. If a part doesn’t match the print, it’s remade or credited.
Questions
Yes, from a new sample part. Send a new part, not the worn one. Wear changes the sizes that matter. It is measured, drawn as a STEP model and a PDF print, and quoted, with the CAD work as its own line. If you know the original material, say so; if the grade or hardness has to be confirmed, that can be arranged and quoted.
Yes, for the machined parts: sleeves, wear rings, bushings, spacers, collars and plates, from a drawing, a model or a new sample part. Parts are supplied as replacements by fit and dimensions. No OEM logos, part numbers or markings are copied. Cast parts are not quoted, either as a casting or as a machined replacement for a part that was originally cast. A reverse-engineering quote lists anything still missing.
Yes. Ten sizes in the same material is one quote, each size at its own quantity, and a mixed order of sleeves, rings and plates goes on one purchase order with one contact. There is no minimum on any line.
Yes, when the print names the material. Writing in Pumps & Systems, Robert Aronen says nonmetallic materials do not seize in the same manner as metal parts. The material and the clearance are set on your drawing, and the ring is quoted from it and inspected against it before it ships.
The bolt-hole positions and the bore and pilot fits, the O-ring groove dimensions if the plate has them, the material, and the finish. A plate in PEEK, G10, stainless or 6061 is milled from the model and print. A finish called out on the print is quoted with the part. Name the face that mates and the features that have to line up, and the quote follows the print.
The quote does not state a pressure rating. It follows your print: the dimensions, material and finish on it are what is quoted, and the fit and the running clearance stay with the pump design.
Yes. A small first lot to check fit and the production quantity can be quoted together on the same print, with the first lot on Rush if it is needed fast. Quotes come back in 24-48 hours.
Quotes come back in 24-48 hours. Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren’t time-sensitive. CNC machining lead time covers what moves a date.
More Industries
Brackets, plates, shafts and housings for robotics and automation, quoted from your print.
View → 02Instrument and fixture parts for medical and laboratory equipment, quoted from your print.
View → 03Shafts, plates, bushings and brackets for machine and equipment builders, quoted from your print.
View → 04Replacement and custom parts for industrial equipment, quoted from your print or a new sample part.
View → 05Prototypes and low-volume runs of the parts in your model, quoted from your files.
View → 06One-offs, iterations and bridge runs, quoted from your files with no minimum.
View → 07Milled enclosures, panels and heat sinks, quoted from your model and drawing.
View → 08Billet brackets, adapters and hubs, one-offs or small batches, quoted from your print.
View → 09Enclosures, mounts, bus bars and test-rig parts, quoted from your print.
View → 10Replacement parts and custom components for ag and off-highway equipment, quoted from your print.
View → 11EDC and knife parts and custom titanium pendants, quoted from your files.
View → 12Scientific parts and instrument components for test labs and R&D groups, quoted from your print.
View → 13Format parts, wear parts and replacements for packaging and food processing lines, quoted from your print.
View → 14Machined details for the weldments you build, quoted on one purchase order.
View → ,Everyone we make parts for, in one place.
View All →Get Started
A quote in 24-48 hours, no minimums. Like the quote, and we’ll make your parts and ship them to you.
Get a Quote