Pricing
Meet-or-Beat Pricing
Send the quote you already have. Get a straight answer.
Meet-or-beat CNC pricing means this: already holding a quote for machined parts from another supplier? Send the same files plus the number you are trying to beat, and within 24-48 hours you get a straight answer: a price that meets or beats it, or an honest “can’t touch that one”. No stringing along. The parts are the same parts: made to your print, no minimum order, and every part inspected against your print before it ships, whatever the price.
Updated October 2026
How it works
Send the same package the other quote was built on (model, print, quantity, and the lead time it was quoted at) plus the competing price. Redact the supplier’s name if you like; the number and the terms are what matter. Apples to apples is the whole point: same part, same quantity, same timeline.
Say what lead time the other quote was priced at, so the two are compared at the same speed. Rush: 1-2 weeks. Standard: 4-6 weeks (typical). Extended: 6-8 weeks, for jobs that aren't time-sensitive. Lead time starts at order approval. Put your need date in the part description and the quote answers it.
Within 24-48 hours you get one of two answers, and both are useful: a price that meets or beats the one in your hand, or a clear no with no follow-up pestering.
Why two quotes for one part can differ
Two quotes compare only on the same basis. Setup comes once per run, and on a very small lot it can far exceed the time to run the parts (source 1); a fixed cost spread over more pieces weighs less on each one (source 2). So a quote at one quantity says little about another quantity. Tolerance counts too: the tighter the tolerance, the more a part costs to machine (source 3), so a quote built on a looser tolerance than your print is not the same part. Ask for more than one quantity, such as 1, 25 and 100, and the quote shows each.
What sets the cost of a CNC machined part goes through the rest of the list: material, geometry, finish, inspection and date.
When it can’t be beaten, and you’ll be told
Sometimes the number in your hand is genuinely strong. You’ll hear exactly that (“that’s a good quote, take it”) because pretending otherwise wastes your time and torches credibility that’s worth more than one order. The straight no is part of the service.
A lower price never touches the print
Meeting a price never quietly relaxes your drawing. The print is the contract: same dimensions, same tolerances, and the same inspection against it before anything ships. The DFM review that comes with a quote can flag a callout the part does not need; any change it suggests arrives with your name on the approval line: your call, always.
Sources
All accessed 4 October 2026. Where a figure here differs from your print, the print governs.
1. Mike Lynch, "The Effect of Lot Size on Productivity", Modern Machine Shop, 21 December 2017, mmsonline.com/articles/the-effect-of-lot-size-on-productivity (setup is the time from the last piece of the previous run to the first good piece of the next; on very small lots it can far exceed the run time).
2. Wikipedia, "Average fixed cost", last edited 29 July 2026: en.wikipedia.org/wiki/Average_fixed_cost (fixed cost divided by quantity; the share per unit falls as output rises).
3. Wikipedia, "Design for manufacturability", last edited 11 September 2026: en.wikipedia.org/wiki/Design_for_manufacturability (the tighter the tolerance, the more expensive the component is to machine).
Questions
Before you send a job.
01 What do you need to compare quotes?
The same files the other quote priced (model and print) plus quantity, lead time and the number. Also say what the other number includes: the material grade, any finish, and whether shipping was folded in. A finish called out on the print is quoted with the part. Shipping is quoted as its own line, or ships on your carrier account. Without matching terms it’s not a real comparison, and you’d only find out the hard way.
02 Will you actually say no?
Yes, plainly and quickly. If the quote in your hand is good, you’ll be told to take it. A meet-or-beat offer only means anything if the no is real.
03 Can I send a quote from an online instant-quote platform?
Yes. A PDF or screenshot of the number and its terms is enough, sent with the same files. Check which material, tolerance and finish that quote assumed, and say so, so the two are compared on the same part.
04 Does this work for production quantities?
Yes, from one piece to production runs of 10,000. Send the real volumes and the real terms, and say if the other quote priced only one quantity.
05 What about one-off parts?
Worth sending. A one-off is a normal order here, with no minimum, and at a quantity of one the whole setup sits on that one piece (sources 1 and 2), so the other quote’s exact quantity matters. The answer is the same as at any quantity: a price that meets or beats the number, or a plain “that’s fair, take it.”
06 Does a lower price mean corners get cut?
No. The print is the contract regardless of price: same tolerances, same inspection before shipping. If a part doesn’t match the print, it’s remade or credited. Any change to the drawing itself is proposed to you first, never assumed.
Get Started
Send us your files.
We’ll take it from there.
A quote in 24-48 hours, no minimums. Like the quote, and we’ll make your parts and ship them to you.
Get a Quote