MI CNC Parts Get a Quote

Answer

How Much Does a Custom Machined Fixture Cost?

The only accurate price for a fixture is a quote on the print. Here is what moves it up or down.

The only accurate price for a custom fixture is a quote on the print, back in 24-48 hours from the quote form. What moves it, in rough order of weight: base size and material (MIC-6 vs 6061 vs steel), the count of machined details, fit classes (a reamed dowel hole held to tenths vs a drilled clearance hole), hardened A2 or D2 details with heat treat and grinding, catalog hardware by count, assembly and pinning, finish, quantity and rush. One fixture is a normal order.

Updated September 2026

Start Here

Get a Quote in 24-48 Hours

Send us your files and we’ll quote it, usually within 24-48 hours.

Need an NDA before you send files? Ask for one and it’s sent the same day.

Get My Quote

Commercial work only. We don’t quote firearms, DoD, ITAR, or EAR-controlled parts.

Size and material set the floor

The base plate is the largest single piece of material in most fixtures, so its size and grade come first. A 6061-T6 base is the least material cost; the same footprint in MIC-6 or ATP-5 cast tooling plate costs more per pound but arrives flat to a published number. Clinton Aluminum’s comparison gives MIC-6 flatness within 0.015 in for 1/4 in through 5/8 in gauges and within 0.005 in from 3/4 in up, and ATP-5 within 0.015 in for 1/4 in through 1/2 in and within 0.005 in from 5/8 in up, both at a thickness tolerance of ±0.005 in (clintonaluminum.com/atp-5-vs-mic-6/). That flatness is why a check fixture base is cast plate and a holding fixture base is often 6061.

Steel bases cost more still, in material and in machining time. A36 or 1018 makes sense when the fixture takes weld spatter, clamping loads that would dent aluminum, or years on a production line; 4140 shows up where the base itself carries wear surfaces. Thickness follows the same logic: a 1 in base costs more to buy and machines away more material than a 1/2 in base, so plate thickness is a place to ask whether the print needs it. Material volume tops the list for machined parts too, and what determines CNC machining cost walks that driver for a part. Every one of these choices is on the print, and the quote prices the print as drawn.

Details, fit classes and the 10:1 rule

Every machined detail is its own setup, its own inspection and its own line on the quote. A base with four risers, two locators and a clamp pad is a nine-piece order even though it ships as one fixture, and the count of pieces moves the price more than the size of any one of them. Within each piece the fit class matters: a drilled clearance hole is one operation, while a reamed dowel hole held to a tenths-class fit is drill, bore and ream plus a pin gage check, and a hardened bushing bore is that plus grinding. CNC machining tolerances explains the bands; every tightening of a tolerance adds an operation or a check.

Check fixtures carry tighter details than the parts they check, and that is by design. Modern Machine Shop’s George Schuetz states the gaging rule of thumb as "the measuring instrument should resolve to approximately one-tenth of the tolerance being measured," with the example of a 0.0002 in total tolerance calling for a gage reading in 20 microinch increments, and notes that at very tight tolerances 4:1 or even 3:1 may be all a master can support (mmsonline.com/articles/the-rule-of-thumb-part-1). On a fixture, a part datum held to ±0.010 in wants a fixture datum held far tighter, which is why check-fixture net pads and gauge pins cost more than the same details on a holding fixture. Check fixture vs gauge covers where that line sits.

Hardened details, hardware and assembly

A hardened detail is three jobs: machine soft, heat treat, grind. Abrams Industries lists A2 as an air-hardening cold-work steel with a working hardness of 58-62 HRC (us.abrams-industries.com/steel/tool-steel/a2), and D2 is treated the same way with more wear resistance. Reaching that hardness is a furnace cycle at a heat treater, and holding a tenths-class size after the cycle means grinding, covered on the precision grinding page. Each step is its own cost and its own queue. A wear pad that could be pre-hardened 4140 or unhardened A2 skips two of the three, and the print is where that call is made.

Hardware adds cost by count and by part number. Toggle clamps, dowel pins, drill bushings and quick-release pins are catalog items; McMaster-Carr’s fixture pins section alone lists dowel pins, locating pins and quick-release pins that retain with a spring-loaded ball (mcmaster.com/products/fixture-pins/). A clamp called out by maker and part number is bought and installed per the print; a clamp described in words needs a selection round first. Assembly is its own line: fitting details to the base, reaming dowel holes through both pieces at assembly, pinning, and checking the assembled fixture against the print. Loose details cost less; a fixture that arrives pinned and checked costs more and is ready to use.

Finish, quantity, print completeness and rush

Finish is specified on the print and quoted with the part. Anodize on aluminum, or any other finish the print calls for, adds a step and a cost. Masking anything that must stay bare adds more. Quantity works the other way: a matched set of three check fixtures shares programming, setup and first-article time, so each one comes in below what a single would, even though material and hardware are the same per fixture. Fixtures carry the same material, tolerance, finish and quantity drivers as any machined part, with detail count, hardware and assembly on top.

A complete print is the cheapest thing you can send. A fixture quoted from a model with no drawing has to assume fit classes, flatness and hardness, and every assumption is either a question that slows the quote or a tolerance called tighter than needed to be safe. Missing fit classes on dowel holes is the most common gap. Rush moves the price too: 1-2 weeks instead of 4-6 buys queue position and expedited material, and it is quoted as a separate number beside the standard so you can choose. Fixture lead time covers what rush needs from you and what it cannot shorten.

What does not drive cost, and how to lower it honestly

A one-piece order is normal and carries no minimum. A single check fixture for one part number is the most common fixture order, and it is quoted the same way as a set; there is no order too small, as CNC parts with no minimum order explains. The buyer’s company size, industry and whether this is a first order change nothing; the print does. Vendor setup takes a day: W-9, NDA and net terms are available, so the paperwork adds nothing to the price or the schedule.

To lower the price without hurting the fixture: loosen tolerances where function allows, keeping the tenths-class fits on the datums and dowels and letting clearance holes and mounting features run standard; call out catalog hardware by part number instead of custom-machined equivalents; choose 6061 for a base where flatness is not the job, and cast plate only where it is; and hold the fixture to one material where possible so a single stock order covers it. If you already hold a quote from somewhere else, meet or beat CNC pricing explains how to send it along with the print.

What to send for a fixture quote

Send a STEP model and a PDF print through the quote form; any file type is accepted, and the quote comes back in 24-48 hours from a person who has read the print. The print should carry datums, fit classes on every located hole, flatness and parallelism on the base, hardness calls on tool steel details, hardware by maker and part number, and the finish. What to send for a custom fixture lists these in order, who makes custom check fixtures covers the check-fixture case, and the custom fixtures page covers the family. The quote flags anything on the print that cannot be made or inspected as drawn.

Questions

Before you send a job.

01 How much does a custom fixture cost?

There is no price list because no two fixtures share a print. A quote on your print comes back in 24-48 hours. The drivers, heaviest first: base size and material, count of machined details, fit classes, hardened details with heat treat and grinding, hardware count, assembly and pinning, finish, quantity and rush. A one-piece order is normal and carries no minimum.

02 Does a check fixture cost more than a weld fixture?

Usually, for the same footprint, because a check fixture holds tighter details. The 10:1 gaging rule of thumb pushes datum pads and gauge pins well inside the tolerance of the part they check, which means reamed and often ground features where a weld fixture uses drilled holes and catalog clamps. A weld fixture in steel can cost more in material; a check fixture costs more in tolerance.

03 Why does a MIC-6 base cost more than 6061?

Cast tooling plate costs more per pound and is chosen for flatness. Clinton Aluminum lists MIC-6 flatness within 0.015 in on 1/4 in through 5/8 in gauges and within 0.005 in from 3/4 in up. A 6061 base can be machined flat but carries no published flatness figure; for a check fixture the cast plate is usually worth it, for a holding fixture often not.

04 Do hardened details add much cost?

They add two steps after machining: heat treat and grinding. Abrams Industries lists A2 at a working hardness of 58-62 HRC, and reaching it is a furnace cycle with a queue; holding a tenths-class size afterward means grinding. Each is its own cost. Pre-hardened 4140 or unhardened A2 wear pads skip both when the print allows.

05 Is there a minimum order for fixtures?

No. One fixture is a normal order and is quoted the same way as a matched set. A set shares programming and setup, so each fixture in it comes in below what a single would, but a single is never turned away or surcharged for being one. Vendor setup takes a day: W-9, NDA and net terms are available.

Get Started

Send us your files.
We’ll take it from there.

A quote in 24-48 hours, no minimums. Like the quote, and we’ll make your parts and ship them to you.

Get a Quote