Who Makes Custom Check Fixtures for a New Part Number?
Three places buyers get check fixtures, how to choose between them, and what the build depends on.
Check fixtures for a new part number come from three places: a gauge and fixture builder, the machine shop that runs the part, or a supplier like MI CNC Parts, where a person quotes the print in 24-48 hours and the fixture is made, inspected and shipped. The build is set by the part print’s datum scheme, the 10:1 rule for fixture tolerance, and a stress-relieved MIC-6 or ATP-5 base. Standard lead time 4-6 weeks, rush 1-2 weeks; start at custom fixtures or the quote form.
Updated November 2026
Start Here
Get a Quote in 24-48 Hours
Send us your files and we’ll quote it, usually within 24-48 hours.
Need an NDA before you send files? Ask for one and it’s sent the same day.
Commercial work only. We don’t quote aerospace, firearms, DoD, ITAR, or EAR-controlled parts.
Before you send it
If there is no fixture print, the quote lists what is still needed before a build-to-print number can be given.
A print without a datum scheme still gets quoted, but the quote asks which surfaces the part locates on, because a fixture that locates on the wrong faces passes bad parts and fails good ones.
The three places buyers get them
The first route is a dedicated gauge and fixture builder, which carries its own CMM and design staff and suits a large fixture with many variable-measurement stations or one that has to match a customer’s measurement plan line by line. The second is the machine shop that already runs the part: it knows the datums and the trouble spots, though the same source then checks its own work. The third is a supplier like MI CNC Parts: a person reads the fixture print, quotes price and lead time in 24-48 hours, inspects the finished fixture against the print and ships it, one order and one contact.
Choose by the fixture, not the label. A single-station check fixture with pins and flush blocks, or a duplicate of an existing fixture for a second line, is build-to-print work that any of the three can quote from the same drawing; compare price, lead time and what the inspection on receipt covers. No drawing yet? Fixture design is quoted as its own line. Send the part, the features to locate and check, and how it’s loaded. Everything on custom fixtures is the first kind: your print rules, and the quote flags anything on it that cannot be made or inspected as drawn. Check fixture vs gauge draws the line between a fixture that checks several features at once and a single gauge that checks one, such as the plug, pin and thread gages on custom gauges.
What drives the build
The datum scheme on the part print sets the fixture. The fixture’s locators are placed to the datum features it names: three points on primary datum A, two on secondary B, one on tertiary C.
The 10:1 rule sets the fixture’s own tolerances. In Modern Machine Shop (mmsonline.com/articles/the-rule-of-thumb-part-1), George Schuetz of Mahr Inc. gives the rule that the measuring instrument should resolve to about one-tenth of the tolerance being measured, and that a master is chosen with a tolerance of 10 percent of the part tolerance. On a check fixture, a ±0.010 in feature on the part points at a ±0.001 in locator position, and a ±0.005 in feature at ±0.0005 in, which is where precision grinding of pins and locators comes in. CNC machining tolerances covers the bands the part itself is held to.
Materials follow flatness and wear. MIC-6 and ATP-5 are stress-relieved cast plate, so the base stays flat after the pockets and dowel holes go in. Locating pins and wear details are A2 or D2, hardened and ground. Delrin pads go wherever the fixture touches a painted, plated or polished face. Custom fixture cost lists these as the lines that move the price.
Timeline at program launch
Order from the released part print, not from first parts: hardened and ground details and a large plate sit at the back of the window, and a launch in automotive or custom machinery usually brings three to ten part numbers, and their fixtures, on one date. Molders and stampers launching a part number are the usual buyer, and fixtures for injection molders and stampers covers that side.
Ordering: what to send and quantities
- What to send. Any file type is accepted. A STEP model plus a 2D PDF drawing is ideal; IGES, SLDPRT, Parasolid, DXF, DWG, STL and ZIP all work, and a sketch, photo or new sample part can start a quote. Send the part model (STEP) and the part print with the datums and the features to be checked marked, the fixture print if one exists, and the quantity, through the quote form. What to send for a custom fixture has the full checklist, down to the fit class on each dowel hole and the finish on the base.
- Quantities. Duplicates for a customer’s incoming inspection are ordered as a quantity on the same print: two, three or one per receiving dock. State the quantity and whether the copies carry the same fixture number with a suffix.
- Files, payment and lead time. How to order CNC parts and what ships with an order cover files, payment, vendor setup, blanket orders and lead time. Standard lead time on a check fixture is 4-6 weeks; rush at 1-2 weeks is quoted when a line date or sample submission date is fixed, and fixture lead time explains what moves a fixture toward either end.
Questions
Before you send a job.
01 Should the same source make the part and its check fixture?
It is convenient, because that source already knows the datums, but it also means the same hands check their own work. Many buyers keep the check fixture separate for that reason, and order a duplicate for incoming inspection so the part is judged the same way on both ends.
02 How tight do a check fixture’s tolerances need to be?
About one-tenth of the part tolerance they check, the 10:1 rule of thumb that also sets gage class. A ±0.010 in hole position on the part points at ±0.001 in on the fixture locator; a ±0.005 in feature at ±0.0005 in, which usually means a hardened and ground pin. Put the part tolerance on the request and the quote works from it.
03 How long does a check fixture take at program launch?
Quotes come back in 24-48 hours. Standard lead time is 4-6 weeks, and rush at 1-2 weeks is quoted on machined details with no secondary operations when a line date or sample submission is fixed. Hardened and ground locators and a large MIC-6 base sit at the back of the window, so order from the released part print.
04 Can I order duplicate check fixtures for my customer’s incoming inspection?
Yes. Duplicates are a quantity on the same print, ordered with the first fixture or later, and both fixtures locate the part on the same datums and check the same features. State how many, and whether each copy carries the same fixture number with a suffix. There is no minimum.
Related
Where to go next.
Custom fixtures
Every fixture family, materials and what to send.
View →Check fixture vs gauge
Where a fixture ends and a gauge begins.
View →What to send for a custom fixture
Model, print, datums, fit classes, hardware BOM.
View →Get a quote
Any file type; STEP + PDF ideal. A person replies in 24-48 hours.
View →Get Started
Send us your files.
We’ll take it from there.
A quote in 24-48 hours, no minimums. Like the quote, and we’ll make your parts and ship them to you.
Get a Quote